Home AEC Base Power Doubles Down on Austin With 325,000 SQFT ‘Factory 2’ Home-Battery Plant at MetCenter
AECAustinIndustrialIndustry News

Base Power Doubles Down on Austin With 325,000 SQFT ‘Factory 2’ Home-Battery Plant at MetCenter

Share
Rendering of a building connected to batteries
Philip Oroni For Unsplash+
Share

Base Power, the $13 billion Austin energy startup, is building a 325,000-square-foot second manufacturing plant at the MetCenter industrial park in East Austin to ramp production of its new home-battery system as it phases out of its temporary factory on the old Statesman site.

Thank you for your interest in The Registry. If you'd like to read further, you must Subscribe or Log In below to read the rest of this content.

Share

Featured Content


Recent Posts

Related Articles

Brennan Acquires Two Austin IOS Properties Spanning 23,000 SQFT Across Eight Acres

The Chicago-based firm added two secured-yard industrial sites near Interstate 35 to...

Travis County Study Pegs Austin-San Antonio Passenger Rail at $13.5B Along SH 130 and I-10

A Travis County-commissioned engineering study has concluded that a high-speed passenger rail...